Stabilization Berm and Surface Drainage Remediation-South Access Road Stabilization at the Blenheim-Gilboa Pumped Storage Power Project*

Attention: open in a new window. PDFPrintE-mail

Location: Gilboa, New York
Owner: New York Power Authority
Contact: Drew Tobias - (914) 681-6625
Approx. Revenue: $6,000,000.00
Description: Project includes removal and placement of 400,000 cubic yards of earth fill, drilling and blasting of approximately 270,000 cubic yards of rock fill and armor rock for construction of a stabilization berm at the toe of an unstable slope along the lower reservoir at the Gilboa Power Plant. The project also includes asphalt pavement improvements, surface drainage improvements and new water line installation.
Completion: August 2002