Heavy/Highway
Replacement of 3 Bridges Rte. 302, 17M & CR 29 D257080
Location: Rte. 302 & 17M, Town of Wallkill, CR 29 Town of East FishkillOwner: NYSDOT
Approx. Revenue: $7,700,000.Description: Demolition of existing structures. Constructing Rte. 17M and CR 29 bridge with Channel Girder System, the first bridge built in the United States to utilize this system. Reconstruction of roadways leading up to the bridges, and construction of acceleration ramps on Rte. 17.
Completion: December 1998
Restoration of Schoharie Creek, Blenheim, Gilboa Power Project – Contract No. C9820081
Location: North Blenheim, New YorkOwner: New York Power Authority
Approx. Revenue: $750,000.
Contact: Owen Mallon, New York Power Authority (914) 287-3028
Description: Excavation for realignment of the Schoharie Creek including construction on cross vane and placement of approximately 14,600 tons of rip rap shore protection.
Completion: November 1998
Rockfall Hazard Mitigation System
Location: Lower Marion Township, PAOwner: 201 Rock Hill Road, LLC-Mainline Honda
Approx. Revenue: $164,000
Contact: Scott Lustgarten - (610) 649-5600
Description: Furnish and install Maccaferri wire mesh rockfall netting. Preparatory work included rock scaling, bolting and clearing of vegetation. Also included installation of 52" high Jersey barrier at the toe of the slope with a sand catchment area.
Completion: October 1997
Reconstruction of Route 59 – D258840*
Location: Route 59, Spring Valley, N.Y.Owner: NYSDOT
Approx. Revenue: $16,136,000.
Contact: Raschid Shariff, EIC - (914) 575-6600
Description: Reconstruction of Route 59, Associated Roadways and Park Rides. Work included replacement of 240' span bridge over New York State Thruway, demolition of old structure, 15,000+ SF of sheet piling with wales and braces, installation of box culverts and related drainage, paving curb and excavation and concrete retaining walls.
Completion: November 1997
Rock Remediation, Rock Fence drape and Misc. Work
Location: NYS Thruway-MP 41.8-Orange CountyOwner: NYS Thruway Authority
Approx. Revenue: $137,000
Description: An emergency rock slope stabilization along the thruway consisting of clearing vegetation, 200 lf of 1" rock bolts and covering slope with wire rope mesh. The height of the failure was approx. 100 lf above the roadway.
Completion: March 1997
Reconstruction of Route 59 – D256770
Location: Route 59, Nanuet, New YorkOwner: NYSDOT
Approx. Revenue: $20,500,000.
Contact: Raschid Shariff, EIC - (914) 575-6000
Description: Reconstruction of Route 59 for approximately 3 miles. Work included 20,000+ LF of drainage pipe, 110,000+ ton asphalt, concrete retaining walls, bridge abutments, excavation and embankment, traffic signals, soil remediation, temporary railroad bridges, construction of new 140' span railroad bridge for NJ Transit and roll-in procedure, temporary sheet pipe cofferdams.
Completion: November 1996
More Articles...
- Beacon Parking Lot & Improvements
- Route 17M Improvements – D256295
- Bridge & Road Construction on Rte. 17 Goshen, New York*
- Superstructure Replacement of Bridge Over Route 44 7 55 and Pavement Rehab & Safety Improvements TAMH 93-65B
- Rock Scaling at Various Locations
- Scour Repair at 16 Bridges D254155