Heavy/Highway
Beacon Parking Lot & Improvements
Location: Beacon, New YorkOwner: Metro North Railroad
MOZA-OS-0779228
Approx. Revenue: $3,183,000.
Contact: Al Muir - (212) 340-2343
Description: Construction of 3 phase parking lot and intermodel connector road. Work included installation and removal of 22,000+ SF temporary sheeting to remove timber ties buried beside railroad tracks, paving and drainage work and gabion retaining walls.
Completion: September 1996
Route 17M Improvements – D256295
Location: Monroe, New YorkOwner: NYSDOT
Approx. Revenue: $2,850,000.
Contact: John Jessup, EIC - (914) 575-6000
Description: Reconstruction of two intersections in the Village of Monroe, New York. Work included excavation and road widening, installation of drainage, large box culvert, paving and traffic signals.
Completion: July 1996
Bridge & Road Construction on Rte. 17 Goshen, New York*
Location: Goshen, N.Y.Owner: NYSDOT - D254479
Approx. Revenue: $8,830,700.
Contact: Dennis Ruppert - (914) 431-5932
Description: Excavation of approximately 275,00 + cubic yards. Construction of 2 miles of new road. Construction of new bridge over Rte. 17. Construction of five ponding areas and landscaping.
Completion: June 1995
Superstructure Replacement of Bridge Over Route 44 7 55 and Pavement Rehab & Safety Improvements TAMH 93-65B
Location: New York Thruway MP 71.61Owner: NY State Thruway Authority
Approx. Revenue: $3,580,000.
Contact: Joseph Roberti, Liaison Engr., NYSTA
Description: Replacement of Rte. 44 & 55 bridges in 4 phases. Rebuilt abutments new structural steel and deck. Milling of existing blacktop for approx. 1 mile, removal of old concrete pavement, placement of new asphalt concrete, new concrete median wall and drainage guide rail.
Completion: December 1994
Rock Scaling at Various Locations
Location: VariousOwner: NYSDOT - D254302
Approx. Revenue: $2,000,000
Contact: Mathew Chrystal
Description: Scaling of rock at various locations along NYSDOT Roadways by mechanical methods or blasting. The project also included the installation of approximately 8000lf of rock bolts, concrete barrier installation, asphalt pavement and drainage improvements.
Completion: July 1993
Scour Repair at 16 Bridges D254155
Location: Delaware, Otsego, Schoharie CountiesOwner: NYS Dept. Of Transportation
Approx. Revenue: $421,000.
Contact: Stan Fuller, EIC, NYSDOT
(607) 432-5810
Description: Scour repair at 16 bridges in various counties & the construction of a concrete & gabion outfall structure. Work includes clearing & grubbing, approx. 4,000 CY of unclassified excavation, grading & reshaping of approx. 2,000 LF of channel, construction of 30 cofferdams, placement of approx. 2,500 CY of stone fill rip rap, installation of approx. 260 CY of gabions & 80 CY of concrete for outfall structure seeding & erosion control measures.
Owner: City of Saratoga Springs, New York
Approx. Revenue: $155,000.
Completion: November 1992