Landfill

Sussex County Landfill – Section 2 Final Cap*

Attention: open in a new window. PDFPrintE-mail

Location: Lafayette, Sussex County, New Jersey
Owner: Sussex County Municipal Utilities Authority
Approx. Revenue: $2,713,000.00
Description: Partial closure of approximately 7.5 acres of the existing Phase 1 and Phase 2A landfill cell. Work includes exposing the existing anchor trenches, grading the waste to states' slope requirements, installation of 12 inches of Intermediate Cover material, Geosynthetic Clay Liner, Geotextile, 40 mil White HDPE Geomembrane, Geocomposite, 12 inches of drainage sand layer, 6 inches of select fill material, blending and installation of select fill with geofibers and 6" layer of topsoil. Also includes the construction of an access road to the top of the landfill, installation of stormwater drainage manholes and piping, diversion swales, toe drains, seeding, mulching, installation of erosion control blankets and permanent gas extraction piping, temporary stormwater relief work in Cell 3 and the restoration of the site.
Completion: October 2008
   

Dynegy – Phase II Ash Landfill – Partial Closure*

Attention: open in a new window. PDFPrintE-mail

Location: Newburgh, New York
Owner: Dynegy Northeast
Approx. Revenue: $1,550,600.00
Description: Partial closure of approximately 4 acres of the existing Phase II Ash Landfill. Work includes erosion control, grading Coal Fly Ash, 40 mil HDPE Geomembrane, Geocomposite, Barrier Protection Layer, Topsoil Layer, Toe Drain System, Rip Rap Downchutes and Stilling basins at the toe. Also includes Rip Rap Diversion Swales, Seeding, Mulching and Erosion Control Blankets.
Completion: October 2008
   

Sussex County Landfill Cell - Phase 3 - Solid Waste Facility*

Attention: open in a new window. PDFPrintE-mail

Location: Lafayette, Sussex County, New Jersey
Owner: Sussex County Municipal Utilities Authority
Contact: Steven Donati (973) 300-9003
Approx. Revenue: $11,342,000.00
Description: Construction of an 18 acre landfill cell including excavation and disposal of approx. 300,000 cy of material, liner system consisting of a secondary and primary liner system of GCL, 60 mil HDPE geomembrane, geocomposite, secondary and primary leachate collection, leachate collection manholes, storm drainage, leachate forcemain, electrical, watermains and drainage layers.
Completion: August 2007
   

Middlesex County Landfill, Phase II Expansion, Cells 7, 8 & 9

Attention: open in a new window. PDFPrintE-mail

ASI/BACC JV is a 50% Partner in this Joint Venture
Location: East Brunswick, Middlesex County, New Jersey
Owner: Middlesex County Utilities Authority
Approx. Revenue: $74,894,900.00
Description: Construction of three new landfill cells on the existing landfill mound, approx. size of the combined cells is 75 acres. Work includes importing of approximately one million cubic yards of sub-grade fill, installation of 720,000 sy of geo-grid, 360,000 sy of geo-composite drainage layer, 720,000 sy of primary and secondary HDPE geo-membrane liner and 720,000 sy of primary and secondary geo-synthetic clay liner(GCL). Also includes more than 300,000 tons of sand drainage layer, construction of ancillary work including perimeter road construction, 6,000 lf of primary and secondary trash netting, inclinometer installation, monitoring well abandonment, perimeter berms, leachate collection and detection piping.
   

Hudson River Psychiatric Center-Landfill Area 3 Closure/Landfill Area 8 Reclamation*

Attention: open in a new window. PDFPrintE-mail

Location: Poughkeepsie, Dutchess Cnty, New York
Owner: NYS Dormitory Authority
Contact: Christopher Canonica, P.E.
EA Engineering (315) 431-4610
Approx. Revenue: $2,584,000.00
Description: Project includes relocation of 36,000 cy of waste from landfill area 8 to landfill area 3.  Landfill area 8 involves installation of clean fill, wetland topsoil placement and wetland seeding/planting.  The area 3 landfill closure includes placement of approximately 40,000 cy of waste, gas vent installation, perimeter drainage installation, installation of a geo-composite gas venting layer, geo-membrane installation, geo-composite drainage layer, installation of a protective soil barrier layer, and placement of topsoil and seed.  All work in accordance with approved contract plans with Part 360 NYS DEC Regulations.
Completion: August 2006
   

Linden Landfill Capping*

Attention: open in a new window. PDFPrintE-mail

Location: City of Linden, New Jersey
Owner: City of Linden
Contact: Louis Scaldino, City of Linden
(908) 474-8400
Approx. Revenue: $9,493,710.00
Description: Capping an existing 55 acre landfill involving grading and moving approx. 200,000 cubic yards, including swales and drainage ditches, installation of 54 gas wells and the installation of approx. 920,000 sf of 40 mil textures liner. After the liner is installed we will be installing approx. 100,000 cubic yards of drainage sand, 50,000 cy of soil barrier and another 50,000 cy of topsoil.
Completion: July 2006
   

Dynegy Northeast Generation Phase III Landfill Expansion

Attention: open in a new window. PDFPrintE-mail

Location: Newburgh, New York
Owner: Dynegy Northeast
Contact: Mark Swyka (845) 492-3133
Approx. Revenue: $6,500,000.00
Description: Project consists of excavation of approximately 45,000 cubic yards of earth and rock to form the Phase III landfill cell. The landfill cell is composed of 48 inches of a low permeability soil liner followed by a secondary and primary HDPE liner and topped with a 24 inch granular drainage blanket. The components of the Secondary leak detection system are geocomposite and perforated PVC collection pipes. The primary and secondary collection systems consist of slotted PVC collection lines to HDPE double contained pipes to double contained manholes which contain pumps that convey leachate to a fiberglass forcemain.
Completion: May 2006
   

Sullivan County Landfill - Cell 6 Expansion*

Attention: open in a new window. PDFPrintE-mail

Location: Monticello, New York
Owner: Sullivan County Dept of Public Works
Contact: Todd Minehardt of Malcolm Pirnie
(518) 786-2137
Approx. Revenue: $4,524,000.00
Description: Work includes creation of a 3.5 acre landfill cell consisting of stabilization layer, geo-textile, 24" clay soil liner, 60 mil HDPE secondary liner, geo-composite, 12" structural soil layer, geo-synthetic clay liner, 60 mil HDPE primary liner, 16 oz. geo-textile, 24" drainage layer, associated earthwork, gas collection header, leachate collection system, topsoil and seed, litter fence and guiderail.
Completion: November 2005
   

Sussex County Landfill Material Processing*

Attention: open in a new window. PDFPrintE-mail

Location: Lafayette, Sussex County, New Jersey
Owner: Sussex County MUA
Contact: Steve Donati, Cerenzio & Panera
(973) 726-9114
Approx. Revenue: $355,000.00
Description: Processing 40,000 yards of material for daily cover.
Completion: November 2005
   

Hudson River Psychiatric Landfill*

Attention: open in a new window. PDFPrintE-mail

Location: Poughkeepsie, New York
Owner: NYS Dormitory Authority
Contact: Richard Buckey - (518) 257-3000
Approx. Revenue: $1,170,000.00
Description: Project encompasses removal of waste from one onsite landfill located at the Hudson River Psychiatric Center to another landfill located onsite. Project also includes installation o f erosion control measures, placement of granular fill, common fill, topsoil and seeding.
Completion: November 2004
   

Page 1 of 4